ASME Section XI Division 2
Alkuperäinen hinta oli: $480.00.$336.00Nykyinen hinta on: $336.00.
ASME Boiler and Pressure Vessel Code Section XI: Rules for Inservice Inspection of Nuclear Reactor Facility Components – Division 2: Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
Vuoden 2023 painos
Julkaisija ASME International, 07/01/2023
Kuvaus
ASME Section XI Division 2 provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.
| Tarkistus | Vuoden 2023 painos | 
|---|---|
| Julkaistu päivämäärä | 1. heinäkuuta 2023 | 
| Tila | Aktiivinen, Nykyisin | 
| Asiakirjan kieli | Englanti | 
| Julkaissut | ASME | 
| Sivumäärä | 152 | 






 Suomi
Suomi				 English
English					           Deutsch
Deutsch					           日本語
日本語					           Svenska
Svenska					           English (UK)
English (UK)					           Français
Français					           ਪੰਜਾਬੀ
ਪੰਜਾਬੀ					           Bahasa Indonesia
Bahasa Indonesia					           한국어
한국어					           Italiano
Italiano					           Magyar
Magyar					           Čeština
Čeština					           繁體中文
繁體中文					           Deutsch (Österreich)
Deutsch (Österreich)					           English (Australia)
English (Australia)					          
Arviot
Tuotearvioita ei vielä ole.